|
|
|
|
|
Before doing these exercises, you may want
to read my column on dangling modifiers. |
|
|
|
|
1. After
studying all night, my test came back with an A. |
|
|
|
|
1. After
studying all night, [who?] my test came back with an A. |
|
|
|
|
1. After
studying all night, I got an A on my test. |
|
|
|
|
1. After
I studied all night, my test came back with an A. |
|
|
|
|
2. To
eliminate dangling modifiers, there are four indicators to watch for. |
|
|
|
|
2. To
eliminate dangling modifiers, [who?] there are four indicators to watch
for. |
|
|
|
|
2. To
eliminate dangling modifiers, [you] watch for four indicators. |
|
|
|
|
3. By
using hardware and software partitioning, obsolescence is minimized, along
with the system design update costs. |
|
|
|
|
3. By using
hardware and software partitioning, [who?] obsolescence is minimized, along
with the system design update costs. |
|
|
|
|
3. By using
hardware and software partitioning, we can minimize obsolescence, along
with the system design update costs. |
|
|
|
|
3. Using
hardware and software partitioning can minimize obsolescence, along with
the system design update costs. |
|
|
|
|
4. By
assigning a process development engineer, Fred’s time can be reallocated to
the Great Lakes Graphics project. |
|
|
|
|
4. By assigning
a process development engineer, [who?] Fred’s time can be reallocated to
the Great Lakes Graphics project. |
|
|
|
|
4. By assigning
a process development engineer, we can reallocate Fred’s time to the Great
Lakes Graphics project. |
|
|
|
|
4. Assigning
a process development engineer allows us to reallocate Fred’s time to the
Great Lakes Graphics project. |
|
|
|
|
5. By
investing in multi-cavity tooling, a cost reduction can be achieved on
three plastic parts. |
|
|
|
|
5. By investing
in multi-cavity tooling, [who?] a cost reduction can be achieved on three
plastic parts. |
|
|
|
|
5. By investing
in multi-cavity tooling, we can reduce costs on three plastic parts. |
|
|
|
|
5. Investing
in multi-cavity tooling can reduce costs on three plastic parts. |
|
|
|
|
6. By
adding a Technical Trainer to the staff in each functional area, these new
employees will get up to speed much faster. |
|
|
|
|
|
|
6. By adding
a Technical Trainer to the staff in each functional area, [who?] these new
employees will get up to speed much faster. |
|
|
|
|
|
|
6. By adding
a Technical Trainer to the staff in each functional area, we can get these
new employees up to speed much faster. |
|
|
|
|
|
|
6. Adding
a Technical Trainer to the staff in each functional area allows us to get
these new employees up to speed much faster. |
|
|
|